as Reported by Terry Holzworth
August 27-31 Page A |
Outside Work on Building | |
August 27-31 Page B |
Sheetrock Installed | |
August 27-31 Page W |
Water Main Connection and Fire Hydrant | |
August 27-31 Page X |
Preparing for Water - Kitchen Valve |