Report for the weekend of September 29-30, 2001

This report will not include all of the photos from the work day on Saturday, September 29. More will be placed on the web site at a future date.

We would like to especially thank the Tongan United Methodist Church for being present again this week to help to place rock and the remaining area of scratch coat mortar on the building exterior. The attached pictures show the results:

Building Exterior:
Photo A - The rock was completed on the east side of the building on Saturday. Photo B - Placing rock was also completed on the north side of the building.
Photo C - Shown is the completed scratch coat of mortar on the front (south) end of the building and on the entryway pillars that was done on Saturday.
Photo D - Shown is the completed scratch coat on the west side of the building, also done Saturday.

Building Interior:
Two workers were busy with the tile in the rest rooms on Sunday. They will come back after the door frames are installed to complete the tile installation near the frames.
Photo E -Applying grout between the spaces of the wall tile on the rest room wall. Photo F - Cleaning the excess grout from the tile surface

Miscellaneous:
Photo G - Oak trim strips await application
Photo H - A composite picture of the power panel in the "storage" room.

Report and photos by David A. Reeves