Thursday, July 26, 2001

Today the steel columns which will support the roof structure were bolted to the foundation!

The City crew poured another section of sidewalk and formed additional sidewalk to a point on the south side of our new driveway opening. That section should be poured tomorrow.

United Rentals delivered three pieces of equipment which will be used in erection of the remainder of the steel frame and metal roof. We are receiving a gift in kind reduction in the rental rate for this equipment which was arranged for by our own Bret Beasley who is Utah Regional Manager for United Rentals.. Thanks, Bret.

Two photos today show the erected steel columns and the rental equipment.